| Specification | LiveiColo Mombasa Two (MBA2)iColo (Digital Realty) | LiveiColo Mombasa One (MBA1)iColo (Digital Realty) | LiveTelkom Kenya: Telephone House (Mombasa)Telkom Kenya |
|---|---|---|---|
| Status | Operational | Operational | Operational |
| Operator | iColo (Digital Realty) | iColo (Digital Realty) | Telkom Kenya |
| Location | Nyali, Mombasa, Mombasa | Miritini, Mombasa, Mombasa | Telephone House, Moi Avenue, Mombasa, Mombasa |
| Live IT load | 1.75 MWLeads | 0.9 MW | Not disclosed / not live |
| Designed capacity | Not disclosed | Not disclosed | Not disclosed |
| Racks | 600Leads | 250 | Not disclosed |
| Tier rating | Not disclosed | Not disclosed | Not disclosed |
| Facility type | Colocation | Colocation | Operator-owned (cable landing) |
| AI-ready | No | No | No |
| Opened / expected | 2022 | 2017 | Not announced |
| Cooling | Not disclosed | Not disclosed | Not disclosed |
| Power source | Kenya Power + backup | Kenya Power + backup | Kenya Power + backup |
| Renewable claim | None on record | None on record | None on record |
| Connectivity | SEACOM (Submarine) · EASSy (Submarine) | SEACOM (Submarine) · EASSy (Submarine) · TEAMS (Submarine) · KIXP Mombasa (IXP) | TEAMS (Submarine) · LION2 (Submarine) · EASSy (Submarine) |
| Certifications | Not disclosed | Not disclosed | Not disclosed |
| Data confidence | High | High | Medium |
| Last verified | September 2026 | September 2026 | September 2026 |
| Notable | 1,200 m² of IT space on a 4,000 m² campus with 20+ networks, per iColo. Approximately 2 km to the nearest beach manhole, direct, short backhaul to submarine cable systems. | 250 racks operational in 580 m², 80+ connectivity providers and three internet exchanges per the operator. iColo states the Miritini campus will eventually hold three data centres across 18,000 m², 13 MW and 1,800 racks. Current IT power on the 4,000 m² site is 0.9 MW per iColo's homepage. Correction (22 September 2026): the 13 MW figure is the planned Miritini campus total (three data centres, 1,800 racks), not an MBA1-only figure; MBA1 itself is documented at 250 racks and 580 sqm of customer space. | Offers cross-connects to submarine cable systems. Telkom holds 23% of TEAMS, 10% of LION2 and 2.6% of EASSy, it is a cable landing party first and a colocation vendor second. |