Every data centre in Kenya, mapped

27 facilities in Kenya, 10 tracked submarine cable systems (7 in service), and the fibre backbone that connects them, with the wider East African region for context.

27

20 operational · 17 in Nairobi metro

28.2 MW

of 230 MW announced pipeline

7

in service of 10 tracked systems

140

members · ~2.9 Tbps peak

East Africa
EQUATORVictoriaTurkanaBURUNDIDEM. REP. CONGODJIBOUTIETHIOPIARWANDASOUTH SUDANSOMALIATANZANIAUGANDAKENYAIndian OceanDARE1 · 1 TbpsSEACOM · 1.3 TbpsPEACE · 16 TbpsTEAMS · 1.3 Tbps2Africa · 180 Tbps systemAfrica-1 · landed, service pendingDaraja · in developmentEASSy · 4.7 TbpsLION2 · 1.5 TbpsNyali landing stationTransborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre, PIDA I.02.30.05 · Active · US$395mPIDA hub · $395mJuba – Nairobi Fiber Optic Link, PIDA I.02.30.06 · Active · US$45mPIDA hub · $395mZTK Transmission Interconnector (Kenya section), PIDA E.02.03.02 · Active · US$50mLAPSSET Crude Oil Pipeline (Lamu – South Sudan), PIDA E.30.03 · Active · US$3064mMombasa – Nairobi SGR (Northern Corridor railway, completed section), PIDA T.05.05.01.01 · Completed · US$5000m4Dar es Salaam3Kampala3Kigali3Addis Ababa4Mombasa4 DC · 7 cables17Nairobi17 data centresN
OperationalUnder constructionAnnouncedSubsea cablePIDA project (continental registry)Terrestrial fibre

The PIDA layer, Kenya on the continental pipeline

Violet diamonds: projects registered in the African Infrastructure Database

Beyond the facilities we verify building-by-building, this map now shows Kenya's registered projects from the African Infrastructure Database, AUDA-NEPAD's continental registry of infrastructure development, home of the Programme for Infrastructure Development in Africa (PIDA). Fetched from the public API on 2026-09-08.

Kenya's registry holds 186 projects worth about US$172 billion across four sectors (transport, energy, water, ICT). The public endpoint serves the first 100 records per request; this layer curates every ICT-sector project in that slice, plus the power and transport corridors that bear directly on Kenya's data centre build-out.

One rule, stated plainly: a registry entry is a project preparation, not a built facility. Nothing in this layer is counted in our capacity totals, the DC Directory and this layer are kept deliberately separate.

ProjectSectorStatusCapexPIDA code

Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre

Kenya · Uganda · Tanzania · South Sudan · Somalia · Ethiopia

ICT · Data CentersActiveUS$395mI.02.30.05

Juba – Nairobi Fiber Optic Link

Kenya · South Sudan

ICT · Fibre Optic CableActiveUS$45mI.02.30.06

Djibouti Africa Regional Express (DARE / DARE1)

Djibouti · Somalia · Kenya

ICT · Fibre Optic CableActiven/p-

Garissa – Kismayo Fibre Optic Link + Kismayo PoP

Kenya · Somalia

ICT · Fibre Optic CableActiven/p-

Nairobi – Mogadishu Fibre Optic Link + Mogadishu PoP

Kenya · Somalia

ICT · Fibre Optic CableActiven/p-

ZTK Transmission Interconnector (Kenya section)

Kenya · Tanzania · Zambia

Energy · TransmissionActiveUS$50mE.02.03.02

LAPSSET Crude Oil Pipeline (Lamu – South Sudan)

Kenya · South Sudan

Energy · PipelineActiveUS$3064mE.30.03

Mombasa – Nairobi SGR (Northern Corridor railway, completed section)

Kenya · Uganda · Rwanda · South Sudan

Transport · RailwayCompletedUS$5000mT.05.05.01.01

Source: AUDA-NEPAD African Infrastructure Database: PIDA project registry, fetched 2026-09-08. Registry records carry the registrant's own figures, we republish them dated, not verified.