Put Kenya's data centres head to head.

Choose up to four facilities and read them side by side, capacity, racks, tier, AI readiness, connectivity and power. Every figure is sourced and dated; nothing here is behind a signup wall.

Comparing 3 of 4 facilities

Pick up to 4, the table below updates and the link stays shareable.

Side-by-side comparison of iColo Nairobi Two (NBO2), Microsoft–G42 AI Data Centre, iXAfrica NBOX2 (Tilisi)
SpecificationLiveiColo Nairobi Two (NBO2)iColo (Digital Realty)Early StageMicrosoft–G42 AI Data CentreSafaricomCommittediXAfrica NBOX2 (Tilisi)iXAfrica Data Centres
StatusOperationalEarly StageCommitted
OperatoriColo (Digital Realty)SafaricomiXAfrica Data Centres
LocationBogani East Road, Karen, Nairobi, NairobiTo be determined (likely Nairobi or Olkaria), NairobiTilisi development, Limuru, Nairobi
Live IT loadNot disclosed / not liveNot disclosed / not liveNot disclosed / not live
Designed capacity6.4 MW100 MWLeads53 MW
RacksNot disclosedNot disclosedNot disclosed
Tier ratingNot disclosedNot disclosedNot disclosed
Facility typeColocationHyperscaleHyperscale
AI-readyNoYesYes
Opened / expected2026Not announcedNot announced
CoolingN+2 cooling (per Digital Realty listing)Not disclosedNot disclosed
Power source2N power; master plan includes a captive substation consuming over 20 MW at full buildRequires dedicated power infrastructureKenya Power (planned)
Renewable claimNone on recordGeothermal power from Olkaria discussed as primary sourceNone on record
ConnectivityNot disclosedNot disclosedNot disclosed
CertificationsISO 27001 · PCI DSSNot disclosedNot disclosed
Data confidenceMediumMediumMedium
Last verifiedSeptember 2026September 2026September 2026
NotableLaunched 7 September 2026 at an event attended by ICT Principal Secretary John Tanui, who framed it as part of Kenya's push to become East Africa's leading digital hub. Designed to serve cloud providers, financial institutions, enterprises and ISPs. Developing Telecoms reported (August 2024) a 6.5 MW IT load within a master plan of three data centres; the Digital Realty listing describes a 3,600 m² building with 2N power, N+2 cooling, PCI-DSS, ISO 27001 and 90-day CCTV retention. Capacity is 6.4 MW per Digital Realty's launch announcement (7 September 2026); an earlier iColo X post (January 2026) and Developing Telecoms (August 2024) cited 6.5 MW IT load, recorded as a pre-launch discrepancy. Digital Realty's listing places NBO2 on the Karen campus about 300 m from NBO1.Would be the largest single foreign direct investment in Kenya's digital infrastructure. Partnership between Microsoft and G42 (UAE-based AI company). Safaricom named as local partner.Land acquired in August 2023 (11 acres) in the Tilisi development. Planned for over 53 MW of IT load, iXAfrica's medium-term growth vector after NBOX1.2.
Full profileView View View

Reading this table: a cyan Leads flag marks the highest figure in a row, it is not an endorsement, and “Not disclosed” means the operator has not published the figure, not that it is zero. Every value carries a source and a verification date on the facility's own profile, see the methodology.