Choose up to four facilities and read them side by side, capacity, racks, tier, AI readiness, connectivity and power. Every figure is sourced and dated; nothing here is behind a signup wall.

Comparing 3 of 4 facilities

Pick up to 4, the table below updates and the link stays shareable.

Side-by-side comparison of iXAfrica NBOX1, Microsoft–G42 AI Data Centre, iXAfrica NBOX2 (Tilisi)
SpecificationLiveiXAfrica NBOX1iXAfrica Data CentresEarly StageMicrosoft–G42 AI Data CentreSafaricomCommittediXAfrica NBOX2 (Tilisi)iXAfrica Data Centres
StatusOperationalEarly StageCommitted
OperatoriXAfrica Data CentresSafaricomiXAfrica Data Centres
LocationCabanas, Mombasa Road, Industrial Area, NairobiTo be determined (likely Nairobi or Olkaria), NairobiTilisi development, Limuru, Nairobi
Live IT load4.5 MWNot disclosed / not liveNot disclosed / not live
Designed capacity22.5 MW100 MWLeads53 MW
Racks780Not disclosedNot disclosed
Tier ratingTier IIINot disclosedNot disclosed
Facility typeHyperscaleHyperscaleHyperscale
AI-readyYesYesYes
Opened / expected2024Not announcedNot announced
CoolingFree-air cooling (operator-stated)Not disclosedNot disclosed
Power sourceKenya Power grid + on-site diesel generatorsRequires dedicated power infrastructureKenya Power (planned)
Renewable claimKenya grid is 75%+ renewable (geothermal, hydro, wind)Geothermal power from Olkaria discussed as primary sourceNone on record
ConnectivityLiquid Datapoint (Fibre) · WIOCC (Submarine) · SEACOM (Submarine) · Telkom Kenya (Fibre) · Safaricom (Fibre) · KIXP (IXP) · LINX Nairobi (IXP)Not disclosedNot disclosed
CertificationsNot disclosedNot disclosedNot disclosed
Data confidenceHighMediumMedium
Last verifiedSeptember 2026September 2026September 2026
NotablePhase one (NBOX1.1) unveiled 28 February 2025 alongside a new KIXP point of presence, with LINX Nairobi also on site. Operator cites up to 40 kW per rack and a campus PUE target of 1.25. On 27 January 2026 iXAfrica announced it will host Oracle Cloud Infrastructure's Nairobi region, no launch date given. Official campus specs (retrieved 22 September 2026): NBOX1.1 live at 4.5 MW with 780 racks; NBOX1.2 adds 18 MW with 3,744 racks, for a campus design of 22.5 MW.Would be the largest single foreign direct investment in Kenya's digital infrastructure. Partnership between Microsoft and G42 (UAE-based AI company). Safaricom named as local partner.Land acquired in August 2023 (11 acres) in the Tilisi development. Planned for over 53 MW of IT load, iXAfrica's medium-term growth vector after NBOX1.2.
Full profileView View View

Reading this table: a cyan Leads flag marks the highest figure in a row, it is not an endorsement, and “Not disclosed” means the operator has not published the figure, not that it is zero. Every value carries a source and a verification date on the facility's own profile, see the methodology.