Skip to content
DC Directory · Compare

Put Kenya's data centres head to head.

Choose up to four facilities and read them side by side, capacity, racks, tier, AI readiness, connectivity and power. Every figure is sourced and dated; nothing here is behind a signup wall.

Comparing 3 of 4 facilities

Pick up to 4, the table below updates and the link stays shareable.

Side-by-side comparison of Telkom Kenya: Milimani Exchange, Microsoft–G42 AI Data Centre, iXAfrica NBOX2 (Tilisi)
SpecificationLiveTelkom Kenya: Milimani ExchangeTelkom KenyaEarly StageMicrosoft–G42 AI Data CentreSafaricomCommittediXAfrica NBOX2 (Tilisi)iXAfrica Data Centres
StatusOperationalEarly StageCommitted
OperatorTelkom KenyaSafaricomiXAfrica Data Centres
LocationTelkom Plaza, Ralph Bunche Road, Upper Hill, NairobiTo be determined (likely Nairobi or Olkaria), NairobiTilisi development, Limuru, Nairobi
Live IT loadNot disclosed / not liveNot disclosed / not liveNot disclosed / not live
Designed capacityNot disclosed100 MWLeads53 MW
Racks100Not disclosedNot disclosed
Tier ratingNot disclosedNot disclosedNot disclosed
Facility typeOperator-owned (open access)HyperscaleHyperscale
AI-readyNoYesYes
Opened / expectedNot announcedNot announcedNot announced
CoolingN+1 cooling per room (operator-stated)Not disclosedNot disclosed
Power sourceDual standby gensets with A and B modular UPSRequires dedicated power infrastructureKenya Power (planned)
Renewable claimNone on recordGeothermal power from Olkaria discussed as primary sourceNone on record
ConnectivityTelkom Fibre (Fibre) · TEAMS (Submarine)Not disclosedNot disclosed
CertificationsNot disclosedNot disclosedNot disclosed
Data confidenceMediumMediumMedium
Last verifiedSeptember 2026September 2026September 2026
NotableOperator specifies 100+ racks of up to 52U rack height, 4 kW dual-input power per rack, and three diverse fibre routes to the site.Would be the largest single foreign direct investment in Kenya's digital infrastructure. Partnership between Microsoft and G42 (UAE-based AI company). Safaricom named as local partner.Land acquired in August 2023 (11 acres) in the Tilisi development. Planned for over 53 MW of IT load, iXAfrica's medium-term growth vector after NBOX1.2.
Full profileView View View

Reading this table: a cyan Leads flag marks the highest figure in a row, it is not an endorsement, and “Not disclosed” means the operator has not published the figure, not that it is zero. Every value carries a source and a verification date on the facility's own profile, see the methodology.