Choose up to four facilities and read them side by side, capacity, racks, tier, AI readiness, connectivity and power. Every figure is sourced and dated; nothing here is behind a signup wall.

Comparing 3 of 4 facilities

Pick up to 4, the table below updates and the link stays shareable.

Side-by-side comparison of Telkom Kenya: Telephone House (Mombasa), iColo Mombasa One (MBA1), iColo Mombasa Two (MBA2)
SpecificationLiveTelkom Kenya: Telephone House (Mombasa)Telkom KenyaLiveiColo Mombasa One (MBA1)iColo (Digital Realty)LiveiColo Mombasa Two (MBA2)iColo (Digital Realty)
StatusOperationalOperationalOperational
OperatorTelkom KenyaiColo (Digital Realty)iColo (Digital Realty)
LocationTelephone House, Moi Avenue, Mombasa, MombasaMiritini, Mombasa, MombasaNyali, Mombasa, Mombasa
Live IT loadNot disclosed / not live0.9 MW1.75 MWLeads
Designed capacityNot disclosedNot disclosedNot disclosed
RacksNot disclosed250600Leads
Tier ratingNot disclosedNot disclosedNot disclosed
Facility typeOperator-owned (cable landing)ColocationColocation
AI-readyNoNoNo
Opened / expectedNot announced20172022
CoolingNot disclosedNot disclosedNot disclosed
Power sourceKenya Power + backupKenya Power + backupKenya Power + backup
Renewable claimNone on recordNone on recordNone on record
ConnectivityTEAMS (Submarine) · LION2 (Submarine) · EASSy (Submarine)SEACOM (Submarine) · EASSy (Submarine) · TEAMS (Submarine) · KIXP Mombasa (IXP)SEACOM (Submarine) · EASSy (Submarine)
CertificationsNot disclosedNot disclosedNot disclosed
Data confidenceMediumHighHigh
Last verifiedSeptember 2026September 2026September 2026
NotableOffers cross-connects to submarine cable systems. Telkom holds 23% of TEAMS, 10% of LION2 and 2.6% of EASSy, it is a cable landing party first and a colocation vendor second.250 racks operational in 580 m², 80+ connectivity providers and three internet exchanges per the operator. iColo states the Miritini campus will eventually hold three data centres across 18,000 m², 13 MW and 1,800 racks. Current IT power on the 4,000 m² site is 0.9 MW per iColo's homepage. Correction (22 September 2026): the 13 MW figure is the planned Miritini campus total (three data centres, 1,800 racks), not an MBA1-only figure; MBA1 itself is documented at 250 racks and 580 sqm of customer space.1,200 m² of IT space on a 4,000 m² campus with 20+ networks, per iColo. Approximately 2 km to the nearest beach manhole, direct, short backhaul to submarine cable systems.
Full profileView View View

Reading this table: a cyan Leads flag marks the highest figure in a row, it is not an endorsement, and “Not disclosed” means the operator has not published the figure, not that it is zero. Every value carries a source and a verification date on the facility's own profile, see the methodology.