Live · OperationalUnverified

Safaricom Red Hill (Limuru) Campus

Safaricom · Red Hill, Limuru Road, Kiambu County, Limuru, Kiambu County

Aerial view of Safaricom Red Hill (Limuru) Campus, Limuru
Safaricom Red Hill (Limuru) Campus from the air, rooftop solar on the completed phase, the next phase under construction alongside. Aerial view: DC254, September 2026, identity confirmed by the publisher

Safaricom Red Hill (Limuru) Campus is a operational data centre facility in Limuru, Kenya, operated by Safaricom. Its total capacity has not been publicly disclosed. The facility carries a Tier III rating. It sits inside DC254's four-stage supply pipeline , see how Kenya's market stages up.

Compare Safaricom Red Hill (Limuru) Campus with Microsoft–G42 AI Data Centre · iXAfrica NBOX2 (Tilisi)

Side by side

III

Tier rating

Enterprise

Facility type

Free cooling supplemented by solar (operator-stated)

Cooling

2025

Opened

Overview

Safaricom's newer three-building campus at Red Hill, Limuru, the strongest certification position in Kenya, with phase one completed March 2025.

Why it matters

Described by Safaricom as a three-building campus "built to Tier III standards", with phase one completed in March 2025 and phase two targeted for January 2026.

Where marketing and evidence diverge

"2.8 MW" circulating in press coverage is the end-of-phase-two target (January 2026), no fetched source confirms phase two actually completed on that date, so treat 2.8 MW as planned rather than commissioned capacity.

Certification position: Uptime's directory shows Red Hill holding both a Tier III Design certificate (expiring 2027) and a Tier III Certification of Constructed Facility awarded 26 March 2024, meaning Uptime inspected the finished building, not just the drawings. The strongest formal certification record of any commercial operator facility in Kenya.

Power

Kenya Power + solar supplement

Free cooling supplemented by solar (operator-stated)