POLICY INTELLIGENCE
East Africa regulatory evidence engine
Data-centre investment increasingly depends on understanding the rules governing licences, data, power, taxation, construction and cross-border transfers. DC254 tracks the underlying regulatory evidence across East Africa.
Who governs East Africa’s data centres?
93%Claim verification rate
- 62 verified
- 5 partial
- 20 structured gaps
Share of entered claims meeting the evidence threshold. 20 research gaps remain across the 10 policy pillars.
- 67
- claims
- 76
- sources
- 20
- gaps
Verification rate = verified claims / claims entered for that country. A pillar not yet researched is a structured gap, never a failed claim.
Policy coverage matrix
10 pillars × 4 countries · 67 claims · every tile opens its evidence
Uganda UG
11V · 3P · 79%Rwanda RW
14V · 1P · 93%Tanzania TZ
18V · 1P · 95%Kenya KE
19V · 0P · 100%Research queue 20
13 high7 mediumCA licensing instruments: the consultation-stage framework document is now CAPTURED (T1, 2026-09-24) but the final instrument is not yet issued - the roadmap targets framework finalisation and the consequential market-structure revision in FY2026/2027 with implementation FY2027/2028. The gazette/legal-notice text of the Revised Telecommunications Market Structure (KE-LC-C2's basis) remains uncaptured; the consultation document dates the revision 'April 2026' vs the CDH alert's 'gazetted 6 March 2026' - unresolved discrepancy.Kenya · Licensing1
CA licensing instruments: the consultation-stage framework document is now CAPTURED (T1, 2026-09-24) but the final instrument is not yet issued - the roadmap targets framework finalisation and the consequential market-structure revision in FY2026/2027 with implementation FY2027/2028. The gazette/legal-notice text of the Revised Telecommunications Market Structure (KE-LC-C2's basis) remains uncaptured; the consultation document dates the revision 'April 2026' vs the CDH alert's 'gazetted 6 March 2026' - unresolved discrepancy.
Expected sources · Final CA data centre licensing framework (post-consultation instrument, FY2026/2027); Kenya Gazette / Kenya Law legal notice for the Revised Telecommunications Market Structure (March/April 2026); CA Knowledge Hub licence-class document (NFP/ASP class definitions)
Upgrade path · Kenya Law route (kenyalaw.org curl-open; new.kenyalaw.org returned 403 2026-09-24) for the gazette notice to resolve the March/April discrepancy; request the final instrument via datacentres@ca.go.ke once issued; re-derive KE-LC-C2 on gazette text.
Masterplan-level instruments not captured: National Digital Masterplan 2022-2032 and the Kenya AI Strategy (2025) documents are uncaptured; only the ministry's functions page is bankedKenya · AI & digital policy2
Masterplan-level instruments not captured: National Digital Masterplan 2022-2032 and the Kenya AI Strategy (2025) documents are uncaptured; only the ministry's functions page is banked
Expected sources · National Digital Masterplan 2022-2032 PDF (ict.go.ke); Kenya National AI Strategy 2025-2030 PDF
Upgrade path · Locate the two PDFs on ministry properties; capture and derive AI/digital-policy claims
No claims researched yet (REG/EUCL tariff classes, power-availability policy for large loads)Rwanda · Energy & electricity3
No claims researched yet (REG/EUCL tariff classes, power-availability policy for large loads)
Expected sources · REG/EUCL published tariffs; Ministry of Infrastructure instruments
Upgrade path · Fetch tariff schedules in the energy increment
Statute level captured and verified (RW-ENV-C1): Law 48/2018 Arts. 30-34 + Ministerial Order 001/2019 Annex I/II trigger lists (two-of-three building thresholds, industries, HV/MV lines). Still open: whether a DC campus is caught (building-classification question under Annex I item 1 degrees) and REMA operational guidance.Rwanda · Environmental4
Statute level captured and verified (RW-ENV-C1): Law 48/2018 Arts. 30-34 + Ministerial Order 001/2019 Annex I/II trigger lists (two-of-three building thresholds, industries, HV/MV lines). Still open: whether a DC campus is caught (building-classification question under Annex I item 1 degrees) and REMA operational guidance.
Expected sources · Rwanda Environment Management Authority (REMA) guidance; Rwanda Building Code 2019
Upgrade path · Classification-practice check (commercial/administrative premise) + capture REMA EIA procedural guidance.
EAC Data Governance Policy Framework validated Oct 2024 now verified from two T1 secretariat records (RW-RG-C1); Cross-border Data Flows Mechanism draft legal instrument in development under the EARDIP consultancy (TOR captured, 240-day schedule). Open: Council adoption status and national implementation records.Rwanda · Regional frameworks5
EAC Data Governance Policy Framework validated Oct 2024 now verified from two T1 secretariat records (RW-RG-C1); Cross-border Data Flows Mechanism draft legal instrument in development under the EARDIP consultancy (TOR captured, 240-day schedule). Open: Council adoption status and national implementation records.
Expected sources · EAC Council of Ministers records; EAC Mechanism for Cross-border Data Flows draft instrument
Upgrade path · Monitor EAC Council outputs for adoption; capture the mechanism draft instrument when published.
Evidence states
claim states · live- Verified62 (93%)
- Partial5 (7%)
- Pending capture0 (0%)
- Unverified0 (0%)
- Contradicted0 (0%)
- Structured gaps20
Unresearched pillars — a condition of research coverage, never a claim state.
Total items67 claims · 76 sources
Since last dataset review
2026-Q3-r15 → 2026-Q3-r16 · 2026-09-26+2 sources registered (Dangote Lamu energy reporting)
Kenyans.co.ke (T2, full capture) + The Africa Report (T2, snippet; paywalled - headline facts only): reference records for the announced 1,000 MW Lamu refinery power plant, ~500 MW offered to Kenya; LNG fuel type per The Africa Report
0 claim changes
61 claims unchanged (55 verified / 6 partially-verified); both records carry explicit no-claim-yet notes - upgrade path opens if a PPA, grid-connection or financing instrument surfaces
20 structured gaps (unchanged)
Energy/construction/environment pillars still unresearched in UG/RW; EAC regional frameworks untouched across all four markets
Release deltas
4 releases · claim- and source-level- r12r132026-09-24+3 claims added+3 sources
Kenya licensing pillar expanded from 1 to 4 claims: the r13 investigation (CDH TMT licensing alert + two trade reports, all captured free via manual curl, zero API credits) registered the NFP-Tier 2 baseline, the CA's 8 September 2026 standalone-licence proposal and the proposed fee schedule. No existing claims, sources or gap records were modified.
- r13r142026-09-24+2 claims added3 revised+2 sources
T1 anchor secured for the Kenya licensing pillar: the CA's 'Proposed Licensing Framework for Data Centres' (September 2026, Consultation Version) captured in full text via Context.dev browser render after the ca.go.ke obfuscated JS challenge was diagnosed as route-specific (clean /open-consultations route open; /index.php/ pages and /sites/default/files/ assets walled). KE-LC-C4 fee schedule upgraded partially-verified to verified on instrument text (para 16 verbatim; 15-year term and USF 0.5 percent noted); KE-LC-C2 and KE-LC-C3 upgraded to T1-backed with states unchanged; two new T1-verified claims registered (KE-LC-C5 NFP/ASP exemption; KE-LC-C6 implementation roadmap). Kenya licensing gap refreshed: final instrument and gazette notice still pending, March-vs-April market-structure date discrepancy flagged open. No existing claims were removed or weakened; 59 to 61 claims, 65 to 67 sources.
- r14r152026-09-260 claim changes+1 source
Reference source added without claim linkage: the IT News Africa announcement of the MTN Digital Infrastructure / Africa Data Hub Holding partnership (31 Aug 2026; UAE investor Tarek Al Ashram; initial focus South Africa and Nigeria; Bayobab a shareholder; framed under MTN's Ambition 2030), captured in full and registered tier-2. Candidate background evidence for the ai-digital-policy and regional-frameworks pillars. 61 claims unchanged (55 verified / 6 partially-verified); source registry 67 -> 68.
- r15r162026-09-260 claim changes+2 sources
Two reference sources added alongside the Dangote Lamu power-plant analysis, both concerning the announced 1,000 MW plant at the proposed Lamu refinery with ~500 MW offered to the Kenyan government: Kenyans.co.ke (tier-2, full text captured 2026-09-26) and The Africa Report (tier-2, snippet capture - paywalled/cookie-walled, headline facts only, establishes the plant's LNG fuel type). Candidate background evidence for the energy-electricity pillar (grid capacity expansion). 61 claims unchanged (55 verified / 6 partially-verified); source registry 68 -> 70.
Every release is diffed against the previous published dataset; claim records resolve to their anchored evidence trails in the pillar deep dives.
Claim-level changes2026-Q3-r12 2026-Q3-r133 claims/3 sources
Kenya licensing pillar expanded from 1 to 4 claims: the r13 investigation (CDH TMT licensing alert + two trade reports, all captured free via manual curl, zero API credits) registered the NFP-Tier 2 baseline, the CA's 8 September 2026 standalone-licence proposal and the proposed fee schedule. No existing claims, sources or gap records were modified.
Editorial decision · All four country pipelines approved for publication; r13 claims registered 2026-09-24 under the editor's standing delegation (r11/r12 precedent), conditional on verification.
Kenya's Unified Licensing Framework contains no data-centre-specific licence category: co-location data centres are licensed under the Network Facilities Provider - Tier 2 category of the Revised Telecommunications Market Structure (gazetted 6 March 2026).
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · ca.go.keT1 · captured/Cliffe Dekker Hofmeyr (CDH)T2 · captured ↗/techafricanews.comT3 · captured ↗/w.media (Brendyn Lotz)T3 · captured ↗
Editorial decision · Registered r13 (2026-09-24) under the editor's standing humanGate delegation, conditional on verification. Verified on two independent corroborating sources: CDH law-firm alert (T2) plus Techafricanews and w.media (T3). Single-source detail (NFP-Tier 1 reliance, per CDH) is held inside the claim note, not upgraded.
On 8 September 2026 the Communications Authority of Kenya published a public notice opening a 30-day comment window on a proposal to introduce a standalone data centre licence category for co-location data centre operators, replacing the Network Facilities Provider - Tier 2 treatment.
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · Cliffe Dekker Hofmeyr (CDH)T2 · captured ↗/techafricanews.comT3 · captured ↗/w.media (Brendyn Lotz)T3 · captured ↗
Editorial decision · Registered r13 (2026-09-24) under the same delegation. Verified on T2 + two independent T3 corroborations; CA notice rationale and coverage quoted verbatim via w.media. Proposal-stage claim: flagged as likely to change or lapse during consultation. Upgrade path: capture the CA public notice itself (ca.go.ke open-consultations JS-blocked 2026-09-24).
The CA's proposed standalone data centre licence carries a proposed fee schedule: KSh 5,000 application fee, KSh 100,000 initial fee, and an annual operating fee of KSh 80,000 or 0.4 percent of gross annual turnover, whichever is higher.
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · w.media (Brendyn Lotz)T3 · captured ↗
Editorial decision · Registered r13 (2026-09-24) under the same delegation, held at partially-verified: single source (w.media T3 quoting the CA notice). Proposal-stage figures may change during consultation. Upgrade path: capture the CA notice or gazette instrument.
Claim-level changes2026-Q3-r13 2026-Q3-r145 claims/2 sources
T1 anchor secured for the Kenya licensing pillar: the CA's 'Proposed Licensing Framework for Data Centres' (September 2026, Consultation Version) captured in full text via Context.dev browser render after the ca.go.ke obfuscated JS challenge was diagnosed as route-specific (clean /open-consultations route open; /index.php/ pages and /sites/default/files/ assets walled). KE-LC-C4 fee schedule upgraded partially-verified to verified on instrument text (para 16 verbatim; 15-year term and USF 0.5 percent noted); KE-LC-C2 and KE-LC-C3 upgraded to T1-backed with states unchanged; two new T1-verified claims registered (KE-LC-C5 NFP/ASP exemption; KE-LC-C6 implementation roadmap). Kenya licensing gap refreshed: final instrument and gazette notice still pending, March-vs-April market-structure date discrepancy flagged open. No existing claims were removed or weakened; 59 to 61 claims, 65 to 67 sources.
Editorial decision · Standing humanGate delegation (editor instruction 'Work on the data set', 2026-09-24; user approval same day), conditional on verification: the T1 consultation text was read in full from the capture before registration. Machine capture is evidence, never verification - verification here is the full-text read against the r13 claim set. Capture front-matter status remains capture-pending per house convention; the claim layer carries the verified states. Credit spend: 1 Context.dev credit for the PDF (born-digital flat rate) plus the index-page capture; two challenge-walled fetch attempts returned empty and were stopped rather than retried blindly.
Kenya's Unified Licensing Framework contains no data-centre-specific licence category: co-location data centres are licensed under the Network Facilities Provider - Tier 2 category of the Revised Telecommunications Market Structure (gazetted 6 March 2026).
Held verified on T2+T3 corroboration (CDH alert, Techafricanews, w.media) since r13; instrument text uncaptured.
Evidence · ca.go.keT1 · captured/Cliffe Dekker Hofmeyr (CDH)T2 · captured ↗/techafricanews.comT3 · captured ↗/w.media (Brendyn Lotz)T3 · captured ↗/Communications Authority of KenyaT1 · captured ↗/Communications Authority of KenyaT1 · captured ↗
Editorial decision · Upgraded to T1-backed 2026-09-24 under the standing humanGate delegation. Para 7 confirms the NFP-T2 baseline verbatim. The instrument's 'revised in April 2026' dating (para 6) conflicts with the held 'gazetted 6 March 2026' (CDH, T2); the discrepancy is flagged in the claim note and left open pending the Kenya Law gazette capture - statement deliberately NOT re-dated on a single conflicting line.
On 8 September 2026 the Communications Authority of Kenya published a public notice opening a 30-day comment window on a proposal to introduce a standalone data centre licence category for co-location data centre operators, replacing the Network Facilities Provider - Tier 2 treatment.
Held verified on T2+T3 corroboration since r13; CA notice quoted only through trade press.
Evidence · Cliffe Dekker Hofmeyr (CDH)T2 · captured ↗/techafricanews.comT3 · captured ↗/w.media (Brendyn Lotz)T3 · captured ↗/Communications Authority of KenyaT1 · captured ↗/Communications Authority of KenyaT1 · captured ↗
Editorial decision · Upgraded to T1-backed 2026-09-24. The regulator's own consultation document and Open Consultations page are now held captures; executive-summary proposal language and the co-location-plus-supporting-services scope confirmed verbatim. Submission channels (datacentres@ca.go.ke, forms link, post) recorded in the source captureNote for the planned DC254 submission.
The CA's proposed standalone data centre licence carries a proposed fee schedule: KSh 5,000 application fee, KSh 100,000 initial fee, and an annual operating fee of KSh 80,000 or 0.4 percent of gross annual turnover, whichever is higher.
Single source (w.media T3 quoting the CA notice) since r13; explicitly held back pending instrument capture.
Evidence · w.media (Brendyn Lotz)T3 · captured ↗/Communications Authority of KenyaT1 · captured ↗/Communications Authority of KenyaT1 · captured ↗
Editorial decision · Upgraded partially-verified to verified 2026-09-24: instrument para 16 confirms every w.media figure exactly. The r13 upgrade condition ('fee claim upgrades if the notice/gazette confirms the schedule') is met on the consultation document itself. 15-year licence term and USF 0.5 percent added to the claim note only, keeping the statement scope stable. Proposal-stage caveat retained in the note.
The CA's proposal permits entities that already hold Network Facilities Provider (NFP) or Application Service Provider (ASP) licences to establish and operate data centres without obtaining the proposed standalone data centre licence.
Not present in r13 - the r13 note held single-source NFP-Tier-1 reliance detail only; the exemption enters the dataset with the instrument capture.
Evidence · Communications Authority of KenyaT1 · captured ↗
Editorial decision · Registered r14 verified on the primary instrument alone (para 17 verbatim), per the status vocabulary's primary-source branch. Kept at proposal tense throughout ('The CA's proposal permits...') to avoid reading the consultation as enacted law.
The CA's proposed roadmap targets finalisation of the data centre licensing framework and a consequential revision of the telecommunications market structure in FY2026/2027, with implementation of the licensing framework in FY2027/2028.
Not present in r13 - FY2027/2028 implementation timing existed only as a w.media sole-source detail inside the KE-LC-C4 note.
Evidence · Communications Authority of KenyaT1 · captured ↗
Editorial decision · Registered r14 verified on the primary instrument (para 19 + Table 1). Upgrades the w.media sole-source timing to instrument-confirmed and adds the FY2026/2027 consequential market-structure revision as a distinct fact, which the press coverage had not separated out.
Claim-level changes2026-Q3-r14 2026-Q3-r150 claims/1 sources
Reference source added without claim linkage: the IT News Africa announcement of the MTN Digital Infrastructure / Africa Data Hub Holding partnership (31 Aug 2026; UAE investor Tarek Al Ashram; initial focus South Africa and Nigeria; Bayobab a shareholder; framed under MTN's Ambition 2030), captured in full and registered tier-2. Candidate background evidence for the ai-digital-policy and regional-frameworks pillars. 61 claims unchanged (55 verified / 6 partially-verified); source registry 67 -> 68.
Editorial decision · Registered as a tier-2 reference record with an explicit no-claim-yet note: a commercial market development, not evidence for any existing statement. HumanGate intact - no claim proposed, nothing upgraded. Registry-only bump (audit pass 5, 2026-09-26).
Claim-level changes2026-Q3-r15 2026-Q3-r160 claims/2 sources
Two reference sources added alongside the Dangote Lamu power-plant analysis, both concerning the announced 1,000 MW plant at the proposed Lamu refinery with ~500 MW offered to the Kenyan government: Kenyans.co.ke (tier-2, full text captured 2026-09-26) and The Africa Report (tier-2, snippet capture - paywalled/cookie-walled, headline facts only, establishes the plant's LNG fuel type). Candidate background evidence for the energy-electricity pillar (grid capacity expansion). 61 claims unchanged (55 verified / 6 partially-verified); source registry 68 -> 70.
Editorial decision · Registered as tier-2 reference records with explicit no-claim-yet notes: a commercial/energy market development at announcement stage. HumanGate intact - no claim proposed, nothing upgraded; upgrade path opens if a PPA, grid-connection or financing instrument surfaces. Registry-only bump (2026-09-26).
Source quality & provenance
76 registered sources · 72% Tier-1 · 78% capturedTier mix
Capture health
Captured sources are stored verbatim in research/captures/ and watched for content drift.
Source explorer
76 matches- T1ca.go.ke — Communications Authority of Kenya - Licensing Procedures (CA licensing section)Regulator licensing page · Captured · ca-licensing-procedures
- T1Communications Authority of Kenya — Communications Authority of Kenya - Proposed Licensing Framework for Data Centres, September 2026 (Consultation Version) - official consultation documentRegulator instrument (consultation document) · Captured · ca-dc-licensing-framework-2026
- T1Communications Authority of Kenya — Communications Authority of Kenya - Open Consultations page (regulator publication channel, data centres entry)Regulator website · Captured · ca-open-consultations-2026
- T1Data Protection and Privacy Office (Rwanda) — Data Protection & Privacy Office (DPO) - official services siteRegulator website · Captured · dpo-gov-rw
- T1dpo.gov.rw — Rwanda Data Protection and Privacy Office - Registration services page (apply as controller/processor; transfer and storage authorisations)Regulator service page · Captured · dpo-rw-registration-page
- T1East African Community (hosted by Tanzania Revenue Authority) — EAC Customs Union Common External Tariff, 2022 Version (updated June 2025) - hosted by TRA, 577ppRegional tariff instrument (full text captured) · Captured · tra-cet-pdf
- T1East African Community Secretariat — EAC set to advance Data Governance and Protection with development of a regional Policy Framework - EAC Secretariat press release, 25 October 2024Regional secretariat official record (validation workshop) · Captured · eac-dgpf-validation-pr
- T1East African Community Secretariat — Terms of Reference: Data Protection Harmonization and Cross-Border Data Flows in the East African Community (EARDIP consultancy, 240 days) - EAC SecretariatRegional procurement instrument (full text captured, 14pp) · Captured · eac-eardip-tor
Selected country control room
Drill into one market: evidence profile, regulator map, the full claim set with evidence trails, distinct sources and the open research gaps.
Kenya KE
100% verified · 19 claims · 27 facilities · 3 open gapsEvidence profile
100%
19 verified · 0 partial · 3 structured gaps
Investigated 22 September 2026 · Largest directory cohort (Nairobi 18, Kiambu 4, Mombasa 4, Machakos 1). Policy claims below are country-level; facility-level evidence lives in the facility evidence dataset.
Priority gaps
- Licensing
- AI & digital policy
Round 1-3 capture mission 2026-09-22: Kenya Law AKN renders a JS shell (acts incl. DPA 2019, SEZ Act, EPZ Act, EMCA not captured); regulator/authority sites captured. Claims are therefore anchored on regulator operations (registers, procedures, licensing platforms) with statute-text upgrades pending.
Regulator map
- Communications
- Communications Authority of Kenya (CA)
- Data protection
- Office of the Data Protection Commissioner (ODPC)
- Investment & zones
- KenInvest / EPZ Authority / Special Economic Zones Authority (SEZA)
- Energy
- Energy and Petroleum Regulatory Authority (EPRA)
- Environment
- National Environment Management Authority (NEMA)
Evidence states
Evidence states describe the condition of a claim. A gap describes the condition of research coverage — it is never a claim, and it never borrows a claim’s status. Hover any state for the full definition.
Open gaps by pillar
structured gapsMethod & governance
Publication status: EDITORIAL REVIEW COMPLETE
All 4 country pipelines approved for publication. Reviewed 22 September 2026 · AI proposes, the editor approves. Editorial approval is a publication decision — it is not a statement that every claim is fully verified.
What policy and regulatory frameworks govern data-centre development and operation across Kenya, Uganda, Rwanda and Tanzania, and where are the material differences?
How claims are built
evidence-first: one claim = one verifiable statement, each tied to tiered sources; the article is the interpretation layer built only after editor review
A pillar with no research yet is recorded as a structured gap - never as an unverified claim. Each gap names expected instruments/regulators and its upgrade path. Gaps are reviewed for staleness at every datasetVersion bump (editor ruling 2026-09-22).
Source tiers & capture states
- T1
- Primary instrument / regulator
- T2
- Independent authoritative
- T3
- Reputable secondary
- captured
- full text captured
- snippet
- snippet capture
- capture-pending
- capture pending
This is not a blog category. It is the auditable evidence layer behind our policy coverage: every statement above is a dataset claim with named sources, tiers and capture states, published under a five-state vocabulary. Where a pillar has not been researched yet it appears as a structured gap. The interpretation lives in our policy explainers; the claims live here. Full editorial gate: EDITORIAL REVIEW COMPLETE (Uganda, Rwanda, Tanzania, Kenya - all four country pipelines approved for publication). Our methodology and editorial policy govern this page. This is regulatory intelligence, not legal advice.
policy-2026-Q3-r17 · 67 claims · 76 sources · 20 structured gaps · download the dataset (JSON)