POLICY INTELLIGENCE
East Africa regulatory evidence engine
Data-centre investment increasingly depends on understanding the rules governing licences, data, power, taxation, construction and cross-border transfers. DC254 tracks the underlying regulatory evidence across East Africa.
Who governs East Africa’s data centres?
90%Claim verification rate
- 55 verified
- 6 partial
- 20 structured gaps
Share of entered claims meeting the evidence threshold. 20 research gaps remain across the 10 policy pillars.
- 61
- claims
- 70
- sources
- 20
- gaps
Verification rate = verified claims / claims entered for that country. A pillar not yet researched is a structured gap, never a failed claim.
Policy coverage matrix
10 pillars × 4 countries · 61 claims · every tile opens its evidence
Uganda UG
9V · 4P · 69%Rwanda RW
12V · 1P · 92%Tanzania TZ
16V · 1P · 94%Kenya KE
18V · 0P · 100%Research queue 20
10 high10 mediumCA licensing instruments: the consultation-stage framework document is now CAPTURED (T1, 2026-09-24) but the final instrument is not yet issued - the roadmap targets framework finalisation and the consequential market-structure revision in FY2026/2027 with implementation FY2027/2028. The gazette/legal-notice text of the Revised Telecommunications Market Structure (KE-LC-C2's basis) remains uncaptured; the consultation document dates the revision 'April 2026' vs the CDH alert's 'gazetted 6 March 2026' - unresolved discrepancy.Kenya · Licensing1
CA licensing instruments: the consultation-stage framework document is now CAPTURED (T1, 2026-09-24) but the final instrument is not yet issued - the roadmap targets framework finalisation and the consequential market-structure revision in FY2026/2027 with implementation FY2027/2028. The gazette/legal-notice text of the Revised Telecommunications Market Structure (KE-LC-C2's basis) remains uncaptured; the consultation document dates the revision 'April 2026' vs the CDH alert's 'gazetted 6 March 2026' - unresolved discrepancy.
Expected sources · Final CA data centre licensing framework (post-consultation instrument, FY2026/2027); Kenya Gazette / Kenya Law legal notice for the Revised Telecommunications Market Structure (March/April 2026); CA Knowledge Hub licence-class document (NFP/ASP class definitions)
Upgrade path · Kenya Law route (kenyalaw.org curl-open; new.kenyalaw.org returned 403 2026-09-24) for the gazette notice to resolve the March/April discrepancy; request the final instrument via datacentres@ca.go.ke once issued; re-derive KE-LC-C2 on gazette text.
Masterplan-level instruments not captured: National Digital Masterplan 2022-2032 and the Kenya AI Strategy (2025) documents are uncaptured; only the ministry's functions page is bankedKenya · AI & digital policy2
Masterplan-level instruments not captured: National Digital Masterplan 2022-2032 and the Kenya AI Strategy (2025) documents are uncaptured; only the ministry's functions page is banked
Expected sources · National Digital Masterplan 2022-2032 PDF (ict.go.ke); Kenya National AI Strategy 2025-2030 PDF
Upgrade path · Locate the two PDFs on ministry properties; capture and derive AI/digital-policy claims
No claims researched yet (REG/EUCL tariff classes, power-availability policy for large loads)Rwanda · Energy & electricity3
No claims researched yet (REG/EUCL tariff classes, power-availability policy for large loads)
Expected sources · REG/EUCL published tariffs; Ministry of Infrastructure instruments
Upgrade path · Fetch tariff schedules in the energy increment
No claims researched yet (REMA EIA requirements for large facilities)Rwanda · Environmental4
No claims researched yet (REMA EIA requirements for large facilities)
Expected sources · Rwanda Environment Management Authority (REMA); Environment Law No 48/2018
Upgrade path · Deferred to a later increment
No data-centre-named licence category captured in Tanzania's convergence framework (vs Rwanda's explicit Annex One Cat. 3); EPOCA 2010 text now captured via CIPIT reproduction (arrangement of sections; s.5 licence-type detail not yet page-walked)Tanzania · Licensing5
No data-centre-named licence category captured in Tanzania's convergence framework (vs Rwanda's explicit Annex One Cat. 3); EPOCA 2010 text now captured via CIPIT reproduction (arrangement of sections; s.5 licence-type detail not yet page-walked)
Expected sources · EPOCA 2010 s.5 licence-type detail (CIPIT viewer page-walk or official mirror); TCRA register CSV export
Upgrade path · Register CSV pull to enumerate licence types; statute text via alternate mirrors
Evidence states
claim states · live- Verified55 (90%)
- Partial6 (10%)
- Pending capture0 (0%)
- Unverified0 (0%)
- Contradicted0 (0%)
- Structured gaps20
Unresearched pillars — a condition of research coverage, never a claim state.
Total items61 claims · 70 sources
Since last dataset review
2026-Q3-r12 → 2026-Q3-r13 · 2026-09-24KE licensing pillar 1 -> 4 claims
KE-LC-C2 verified (data centres licensed under NFP-Tier 2, no DC-specific class) + KE-LC-C3 verified (8 Sep 2026 CA notice proposing a standalone data centre licence, 30-day window)
+3 sources registered
CDH TMT licensing alert (T2) · Techafricanews (T3) · w.media quoting the CA notice (T3); all captured free via curl, zero API credits
+1 claim registered partially-verified
KE-LC-C4 proposed fee schedule (KSh 5,000 / 100,000 / 80,000 or 0.4% turnover) - single source; CA notice capture is the upgrade path
20 structured gaps (unchanged)
CA licence-class instrument still uncaptured; proposal-stage claims may change during consultation
Claim-level changes2026-Q3-r12 2026-Q3-r133 claims/3 sources
Kenya licensing pillar expanded from 1 to 4 claims: the r13 investigation (CDH TMT licensing alert + two trade reports, all captured free via manual curl, zero API credits) registered the NFP-Tier 2 baseline, the CA's 8 September 2026 standalone-licence proposal and the proposed fee schedule. No existing claims, sources or gap records were modified.
Editorial decision · All four country pipelines approved for publication; r13 claims registered 2026-09-24 under the editor's standing delegation (r11/r12 precedent), conditional on verification.
- KE-LC-C2addedVerifiedKenya · Licensing
Kenya's Unified Licensing Framework contains no data-centre-specific licence category: co-location data centres are licensed under the Network Facilities Provider - Tier 2 category of the Revised Telecommunications Market Structure (gazetted 6 March 2026).
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · ca.go.keT1 · captured/Cliffe Dekker Hofmeyr (CDH)T2 · captured/techafricanews.comT3 · captured/w.media (Brendyn Lotz)T3 · captured
Editorial decision · Registered r13 (2026-09-24) under the editor's standing humanGate delegation, conditional on verification. Verified on two independent corroborating sources: CDH law-firm alert (T2) plus Techafricanews and w.media (T3). Single-source detail (NFP-Tier 1 reliance, per CDH) is held inside the claim note, not upgraded.
- KE-LC-C3addedVerifiedKenya · Licensing
On 8 September 2026 the Communications Authority of Kenya published a public notice opening a 30-day comment window on a proposal to introduce a standalone data centre licence category for co-location data centre operators, replacing the Network Facilities Provider - Tier 2 treatment.
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · Cliffe Dekker Hofmeyr (CDH)T2 · captured/techafricanews.comT3 · captured/w.media (Brendyn Lotz)T3 · captured
Editorial decision · Registered r13 (2026-09-24) under the same delegation. Verified on T2 + two independent T3 corroborations; CA notice rationale and coverage quoted verbatim via w.media. Proposal-stage claim: flagged as likely to change or lapse during consultation. Upgrade path: capture the CA public notice itself (ca.go.ke open-consultations JS-blocked 2026-09-24).
- KE-LC-C4addedPartialKenya · Licensing
The CA's proposed standalone data centre licence carries a proposed fee schedule: KSh 5,000 application fee, KSh 100,000 initial fee, and an annual operating fee of KSh 80,000 or 0.4 percent of gross annual turnover, whichever is higher.
Not present in r12 - the Kenya licensing pillar held only KE-LC-C1.
Evidence · w.media (Brendyn Lotz)T3 · captured
Editorial decision · Registered r13 (2026-09-24) under the same delegation, held at partially-verified: single source (w.media T3 quoting the CA notice). Proposal-stage figures may change during consultation. Upgrade path: capture the CA notice or gazette instrument.
Claim-level changes2026-Q3-r13 2026-Q3-r145 claims/2 sources
T1 anchor secured for the Kenya licensing pillar: the CA's 'Proposed Licensing Framework for Data Centres' (September 2026, Consultation Version) captured in full text via Context.dev browser render after the ca.go.ke obfuscated JS challenge was diagnosed as route-specific (clean /open-consultations route open; /index.php/ pages and /sites/default/files/ assets walled). KE-LC-C4 fee schedule upgraded partially-verified to verified on instrument text (para 16 verbatim; 15-year term and USF 0.5 percent noted); KE-LC-C2 and KE-LC-C3 upgraded to T1-backed with states unchanged; two new T1-verified claims registered (KE-LC-C5 NFP/ASP exemption; KE-LC-C6 implementation roadmap). Kenya licensing gap refreshed: final instrument and gazette notice still pending, March-vs-April market-structure date discrepancy flagged open. No existing claims were removed or weakened; 59 to 61 claims, 65 to 67 sources.
Editorial decision · Standing humanGate delegation (editor instruction 'Work on the data set', 2026-09-24; user approval same day), conditional on verification: the T1 consultation text was read in full from the capture before registration. Machine capture is evidence, never verification - verification here is the full-text read against the r13 claim set. Capture front-matter status remains capture-pending per house convention; the claim layer carries the verified states. Credit spend: 1 Context.dev credit for the PDF (born-digital flat rate) plus the index-page capture; two challenge-walled fetch attempts returned empty and were stopped rather than retried blindly.
- KE-LC-C2updatedVerifiedKenya · Licensing
Kenya's Unified Licensing Framework contains no data-centre-specific licence category: co-location data centres are licensed under the Network Facilities Provider - Tier 2 category of the Revised Telecommunications Market Structure (gazetted 6 March 2026).
Held verified on T2+T3 corroboration (CDH alert, Techafricanews, w.media) since r13; instrument text uncaptured.
Evidence · ca.go.keT1 · captured/Cliffe Dekker Hofmeyr (CDH)T2 · captured/techafricanews.comT3 · captured/w.media (Brendyn Lotz)T3 · captured/Communications Authority of KenyaT1 · captured/Communications Authority of KenyaT1 · captured
Editorial decision · Upgraded to T1-backed 2026-09-24 under the standing humanGate delegation. Para 7 confirms the NFP-T2 baseline verbatim. The instrument's 'revised in April 2026' dating (para 6) conflicts with the held 'gazetted 6 March 2026' (CDH, T2); the discrepancy is flagged in the claim note and left open pending the Kenya Law gazette capture - statement deliberately NOT re-dated on a single conflicting line.
- KE-LC-C3updatedVerifiedKenya · Licensing
On 8 September 2026 the Communications Authority of Kenya published a public notice opening a 30-day comment window on a proposal to introduce a standalone data centre licence category for co-location data centre operators, replacing the Network Facilities Provider - Tier 2 treatment.
Held verified on T2+T3 corroboration since r13; CA notice quoted only through trade press.
Evidence · Cliffe Dekker Hofmeyr (CDH)T2 · captured/techafricanews.comT3 · captured/w.media (Brendyn Lotz)T3 · captured/Communications Authority of KenyaT1 · captured/Communications Authority of KenyaT1 · captured
Editorial decision · Upgraded to T1-backed 2026-09-24. The regulator's own consultation document and Open Consultations page are now held captures; executive-summary proposal language and the co-location-plus-supporting-services scope confirmed verbatim. Submission channels (datacentres@ca.go.ke, forms link, post) recorded in the source captureNote for the planned DC254 submission.
- KE-LC-C4updatedVerifiedKenya · Licensing
The CA's proposed standalone data centre licence carries a proposed fee schedule: KSh 5,000 application fee, KSh 100,000 initial fee, and an annual operating fee of KSh 80,000 or 0.4 percent of gross annual turnover, whichever is higher.
Single source (w.media T3 quoting the CA notice) since r13; explicitly held back pending instrument capture.
Evidence · w.media (Brendyn Lotz)T3 · captured/Communications Authority of KenyaT1 · captured/Communications Authority of KenyaT1 · captured
Editorial decision · Upgraded partially-verified to verified 2026-09-24: instrument para 16 confirms every w.media figure exactly. The r13 upgrade condition ('fee claim upgrades if the notice/gazette confirms the schedule') is met on the consultation document itself. 15-year licence term and USF 0.5 percent added to the claim note only, keeping the statement scope stable. Proposal-stage caveat retained in the note.
- KE-LC-C5addedVerifiedKenya · Licensing
The CA's proposal permits entities that already hold Network Facilities Provider (NFP) or Application Service Provider (ASP) licences to establish and operate data centres without obtaining the proposed standalone data centre licence.
Not present in r13 - the r13 note held single-source NFP-Tier-1 reliance detail only; the exemption enters the dataset with the instrument capture.
Evidence · Communications Authority of KenyaT1 · captured
Editorial decision · Registered r14 verified on the primary instrument alone (para 17 verbatim), per the status vocabulary's primary-source branch. Kept at proposal tense throughout ('The CA's proposal permits...') to avoid reading the consultation as enacted law.
- KE-LC-C6addedVerifiedKenya · Licensing
The CA's proposed roadmap targets finalisation of the data centre licensing framework and a consequential revision of the telecommunications market structure in FY2026/2027, with implementation of the licensing framework in FY2027/2028.
Not present in r13 - FY2027/2028 implementation timing existed only as a w.media sole-source detail inside the KE-LC-C4 note.
Evidence · Communications Authority of KenyaT1 · captured
Editorial decision · Registered r14 verified on the primary instrument (para 19 + Table 1). Upgrades the w.media sole-source timing to instrument-confirmed and adds the FY2026/2027 consequential market-structure revision as a distinct fact, which the press coverage had not separated out.
Source quality & provenance
70 registered sources · 70% Tier-1 · 76% capturedTier mix
Capture health
Captured sources are stored verbatim in research/captures/ and watched for content drift.
Source explorer
70 matches- T1ca.go.ke — Communications Authority of Kenya - Licensing Procedures (CA licensing section)Regulator licensing page · Captured · ca-licensing-procedures
- T1Communications Authority of Kenya — Communications Authority of Kenya - Proposed Licensing Framework for Data Centres, September 2026 (Consultation Version) - official consultation documentRegulator instrument (consultation document) · Captured · ca-dc-licensing-framework-2026
- T1Communications Authority of Kenya — Communications Authority of Kenya - Open Consultations page (regulator publication channel, data centres entry)Regulator website · Captured · ca-open-consultations-2026
- T1Data Protection and Privacy Office (Rwanda) — Data Protection & Privacy Office (DPO) - official services siteRegulator website · Captured · dpo-gov-rw
- T1dpo.gov.rw — Rwanda Data Protection and Privacy Office - Registration services page (apply as controller/processor; transfer and storage authorisations)Regulator service page · Captured · dpo-rw-registration-page
- T1East African Community (hosted by Tanzania Revenue Authority) — EAC Customs Union Common External Tariff, 2022 Version (updated June 2025) - hosted by TRA, 577ppRegional tariff instrument (full text captured) · Captured · tra-cet-pdf
- T1Energy and Water Utilities Regulatory Authority (EWURA) — EWURA - Electricity Infrastructure (official page)Regulator website · Captured · ewura-elec-infra-page
- T1Energy and Water Utilities Regulatory Authority (EWURA) — EWURA - Electricity Licensing and Registration (official page)Regulator website · Captured · ewura-licensing-page
Selected country control room
Drill into one market: evidence profile, regulator map, the full claim set with evidence trails, distinct sources and the open research gaps.
Kenya KE
100% verified · 18 claims · 27 facilities · 3 open gapsEvidence profile
100%
18 verified · 0 partial · 3 structured gaps
Investigated 22 September 2026 · Largest directory cohort (Nairobi 18, Kiambu 4, Mombasa 4, Machakos 1). Policy claims below are country-level; facility-level evidence lives in the facility evidence dataset.
Priority gaps
- Licensing
- AI & digital policy
Round 1-3 capture mission 2026-09-22: Kenya Law AKN renders a JS shell (acts incl. DPA 2019, SEZ Act, EPZ Act, EMCA not captured); regulator/authority sites captured. Claims are therefore anchored on regulator operations (registers, procedures, licensing platforms) with statute-text upgrades pending.
Regulator map
- Communications
- Communications Authority of Kenya (CA)
- Data protection
- Office of the Data Protection Commissioner (ODPC)
- Investment & zones
- KenInvest / EPZ Authority / Special Economic Zones Authority (SEZA)
- Energy
- Energy and Petroleum Regulatory Authority (EPRA)
- Environment
- National Environment Management Authority (NEMA)
Evidence states
Evidence states describe the condition of a claim. A gap describes the condition of research coverage — it is never a claim, and it never borrows a claim’s status. Hover any state for the full definition.
Open gaps by pillar
structured gapsMethod & governance
Publication status: EDITORIAL REVIEW COMPLETE
All 4 country pipelines approved for publication. Reviewed 22 September 2026 · AI proposes, the editor approves. Editorial approval is a publication decision — it is not a statement that every claim is fully verified.
What policy and regulatory frameworks govern data-centre development and operation across Kenya, Uganda, Rwanda and Tanzania, and where are the material differences?
How claims are built
evidence-first: one claim = one verifiable statement, each tied to tiered sources; the article is the interpretation layer built only after editor review
A pillar with no research yet is recorded as a structured gap - never as an unverified claim. Each gap names expected instruments/regulators and its upgrade path. Gaps are reviewed for staleness at every datasetVersion bump (editor ruling 2026-09-22).
Source tiers & capture states
- T1
- Primary instrument / regulator
- T2
- Independent authoritative
- T3
- Reputable secondary
- captured
- full text captured
- snippet
- snippet capture
- capture-pending
- capture pending
This is not a blog category. It is the auditable evidence layer behind our policy coverage: every statement above is a dataset claim with named sources, tiers and capture states, published under a five-state vocabulary. Where a pillar has not been researched yet it appears as a structured gap. The interpretation lives in our policy explainers; the claims live here. Full editorial gate: EDITORIAL REVIEW COMPLETE (Uganda, Rwanda, Tanzania, Kenya - all four country pipelines approved for publication). Our methodology and editorial policy govern this page. This is regulatory intelligence, not legal advice.
policy-2026-Q3-r16 · 61 claims · 70 sources · 20 structured gaps · download the dataset (JSON)