Policy pillar deep dive · dataset policy-2026-Q3-r17
Environmental
EIA requirements, environmental compliance regimes and expert registration.
- Coverage
- 80% verified
- Claims
- 5 claims
- Sources
- 7 sources
- Countries covered
- 4/4 markets
- Structured gaps
- 3 gaps
Coverage across the four markets
Uganda UG
100%
1 verified · 0 partial · 0 other
structured gap
Rwanda RW
100%
1 verified · 0 partial · 0 other
structured gap
Tanzania TZ
50%
1 verified · 1 partial · 0 other
structured gap
Kenya KE
100%
1 verified · 0 partial · 0 other
Open the same tiles in the coverage matrix to compare this pillar against every other pillar.
Claims & evidence trails
Uganda UG
1 claim- VerifiedUG-ENV-C1
Uganda's National Environment Act 2019 (ss.110-113) runs a two-track environmental and social assessment regime: Schedule 4 projects proceed on a NEMA project brief, while Schedule 5 projects - explicitly including solar plants above 2 MW, thermal power generation and other combustion installations, wind farms of at least 10 MW, hydropower above 1 MW, high-voltage transmission lines, distribution lines above 33 kV, electrical substations, and industrial estates or development parks - require a full environmental and social impact assessment (scoping, terms of reference, study).
T1 official Gazette print (Acts Supplement No. 2, 7 Mar 2019, UPPC) via FAOLEX - research/captures/2026-10-01-ug-nea-2019-esia-schedule5.md. A data-centre campus is NOT a named Schedule 5 category; exposure arrives via the power-infrastructure subitems or industrial-park siting - read-across deliberately not asserted. Printed '2500/10,000m2' floor-area notation (Sch.5 item 5(e)) flagged verbatim, unresolved. ESIA Regulations 2020 uncaptured - operational Category lists remain the open gap (see pillarGaps). MW/kV figures are regulatory trigger thresholds, never market baselines (Task 54).
View evidence trail · 1 source ▾
- Uganda Government Printer (UPPC) via FAOLEX — Uganda National Environment Act, 2019 (Act 5 of 2019) - Acts Supplement No. 2 to the Uganda Gazette No. 10 Vol. CXII, 7 March 2019 (178pp)T1 · captured ↗
Rwanda RW
1 claim- VerifiedRW-ENV-C1
Rwanda's Ministerial Order No. 001/2019 (under Law No. 48/2018 of 13/08/2018 on Environment, Arts. 30-34) subjects buildings classified as commercial or administrative that meet at least two of three thresholds (capacity above 500 people, floor area above 1,500 sqm, plot above 1,000 sqm), plus industries and high- and medium-voltage electrical lines, to full environmental impact assessment, approved by REMA, with consultancy costs borne by the project initiator.
T1 trilingual Official Gazette prints via FAOLEX - research/captures/2026-10-01-rw-env-law-48-2018-eia-order-001-2019.md. Two-of-three structure and the building-classification premise are claim-critical and preserved (not shortened to 'any large building requires EIA'); the 'publicly accessible facilities' phrasing in Annex I item 1 degrees leaves DC classification open - not resolved editorially. Order supersedes Ministerial Order 001/2018. sqm/person thresholds are regulatory triggers, never market baselines (Task 54).
View evidence trail · 2 sources ▾
- Republic of Rwanda, Official Gazette via FAOLEX — Rwanda Law No. 48/2018 of 13/08/2018 on Environment - Official Gazette no. Special of 21/09/2018 (trilingual KIN/ENG/FRE)T1 · captured ↗
- Republic of Rwanda, Official Gazette via FAOLEX — Rwanda Ministerial Order No. 001/2019 of 15/04/2019 establishing the list of projects that must undergo environmental impact assessment - Official Gazette no. 15 of 15/04/2019 (trilingual)T1 · captured ↗
Tanzania TZ
2 claims- PartialTZ-ENV-C1
NEMC operates an active environmental-compliance regime: it publishes regulations (including the Registration and Practice of Environmental Experts Regulations 2021) and announces environmental certificates issued monthly (lists for July and August 2026 are live on its site).
Regulator operations confirmed from official pages; the Environmental Management Act 2004 is now captured (T1, TanzLII consolidated 2023-12-31 - corrected r17: EIA triggers are the THIRD Schedule, see TZ-ENV-C2); the EIA Regulations' category lists (whether a DC-scale facility is mandatory) remain capture-pending. eia.nemc.or.tz portal is the operational entry point.
View evidence trail · 2 sources ▾
- National Environment Management Council (NEMC) — NEMC - Regulations (official publications page)T1 · capturedKanuni | NEMC (Regulations): hosts Environmental Management instruments incl. Registration and Practice of Environmental Experts Regulations 2021 (50pp PDF captured).
- National Environment Management Council (NEMC) — NEMC - Environmental certificates issued (monthly announcements, July/August 2026)T1 · snippetAnnouncements: Environmental certificates issued in August 2026 / List of environmental certificates of July 2026.
- VerifiedTZ-ENV-C2
Tanzania's Environmental Management Act 2004 (s.81) mandates an Environmental Impact Assessment, at the proponent's cost, for projects of a type specified in the Act's Third Schedule - which includes electrical infrastructure (item 10) and any structure of a scale not in keeping with its surroundings (item 1(b)) - and s.81(3) provides that a licence or permit under any other written law does not entitle a developer to proceed without an EIA Certificate issued under the Act.
T1 full act text (TanzLII, consolidated 2023-12-31) - research/captures/2026-10-01-tz-ema-2004-tanzlii.md. CLAIM-CRITICAL CORRECTION applied r17: the EIA trigger list is the THIRD Schedule (s.81(1), s.102(1)), not the First Schedule as the pre-r17 gap text and TZ-ENV-C1's note said (First = National Environmental Advisory Committee composition, s.11(3)). Does NOT assert that DCs require EIA: mandatory-vs-exempt categorisation runs through the EIA Regulations (uncaptured). Environmental Management (Amendment) Act 2025 (Act 5/2025, TanzLII eng@2025-03-14) flagged uncaptured - currency re-check on capture. Threshold items are regulatory triggers, never market baselines (Task 54).
View evidence trail · 1 source ▾
- TanzLII (Judiciary of Tanzania / Office of the Attorney General) — Tanzania National Environmental Management Act (EMA 2004, Cap. 191) - TanzLII consolidated text to 31 December 2023T1 · captured ↗
Kenya KE
1 claim- VerifiedKE-ENV-C1
Kenya's environmental regime is actively administered by NEMA: environmental impact assessment (EIA) and strategic environmental assessment (SEA) reports are submitted and published, and environmental experts are registered with qualification requirements.
T1 regulator capture showing the EIA/SEA machinery in operation (reports, experts register). EMCA 1999 statutory wording (s.58 obligation) uncaptured - upgrade path, not a separate claim until captured.
View evidence trail · 1 source ▾
- nema.go.ke — National Environment Management Authority (Kenya) - site (EIA/SEA regime, licensed experts register)T1 · capturedNational Environment Management Authority ... Experts Register & Qualifications ... DOWNLOADS: EIA/SEA Reports, SEA/SESA Reports ...
Sources behind this pillar
- T1National Environment Management Council (NEMC) — NEMC - Regulations (official publications page)Government agency website · captured · nemc-regs-page
- T1National Environment Management Council (NEMC) — NEMC - Environmental certificates issued (monthly announcements, July/August 2026)Regulator operational record · snippet · nemc-certificates-2026
- T1nema.go.ke — National Environment Management Authority (Kenya) - site (EIA/SEA regime, licensed experts register)Regulator official site · captured · nema-home
- T1Republic of Rwanda, Official Gazette via FAOLEX — Rwanda Law No. 48/2018 of 13/08/2018 on Environment - Official Gazette no. Special of 21/09/2018 (trilingual KIN/ENG/FRE)National framework statute (official Gazette print, full text) · captured · rw-env-law-48-2018-faolex
- T1Republic of Rwanda, Official Gazette via FAOLEX — Rwanda Ministerial Order No. 001/2019 of 15/04/2019 establishing the list of projects that must undergo environmental impact assessment - Official Gazette no. 15 of 15/04/2019 (trilingual)Statutory order - EIA project list (official Gazette print, full text) · captured · rw-eia-order-001-2019-faolex
- T1TanzLII (Judiciary of Tanzania / Office of the Attorney General) — Tanzania National Environmental Management Act (EMA 2004, Cap. 191) - TanzLII consolidated text to 31 December 2023National statute (full text captured, consolidated) · captured · tanzlii-ema-2004
- T1Uganda Government Printer (UPPC) via FAOLEX — Uganda National Environment Act, 2019 (Act 5 of 2019) - Acts Supplement No. 2 to the Uganda Gazette No. 10 Vol. CXII, 7 March 2019 (178pp)National statute (official Gazette print, full text) · captured · ug-nea-2019-faolex
Structured gaps
Uganda — structured gap, not a finding
Statute level captured and verified (UG-ENV-C1): National Environment Act 2019 two-track regime with verbatim Schedule 5 ESIA triggers (power infrastructure, industrial parks). Still open: ESIA Regulations 2020 operational Category lists and NEMA guidance - whether a DC-scale campus is caught in practice unconfirmed.
Expected sources: Uganda ESIA Regulations, 2020; National Environment Management Authority (NEMA) guidance
Upgrade path: Capture ESIA Regulations 2020 (FAOLEX/ECOLEX mirror preferred; ULII Cloudflare-blocked) and check Category lists against DC-scale loads.
Rwanda — structured gap, not a finding
Statute level captured and verified (RW-ENV-C1): Law 48/2018 Arts. 30-34 + Ministerial Order 001/2019 Annex I/II trigger lists (two-of-three building thresholds, industries, HV/MV lines). Still open: whether a DC campus is caught (building-classification question under Annex I item 1 degrees) and REMA operational guidance.
Expected sources: Rwanda Environment Management Authority (REMA) guidance; Rwanda Building Code 2019
Upgrade path: Classification-practice check (commercial/administrative premise) + capture REMA EIA procedural guidance.
Tanzania — structured gap, not a finding
CORRECTED r17 per captured T1 text: the EMA 2004 EIA trigger list is the THIRD Schedule (s.81), not the First Schedule as previously recorded. Statute captured and verified (TZ-ENV-C2): triggers include electrical infrastructure (item 10) and out-of-scale structures (item 1(b)); s.81(3) licence does not substitute the EIA Certificate. Still open: EIA Regulations category lists (mandatory vs exempt) - whether DC-scale load is caught unconfirmed - and the 2025 EMA amendment text.
Expected sources: Environmental Management (EIA) Regulations 2005; Environmental Management (Amendment) Act 2025 (Act No. 5 of 2025); eia.nemc.or.tz portal
Upgrade path: Capture the EIA Regulations 2005 + Act 5/2025 (TanzLII eng@2025-03-14 flagged) and re-check s.81 / Third Schedule currency.
policy-2026-Q3-r17 · 5 claims in this pillar · 7 sources · editorial gate: EDITORIAL REVIEW COMPLETE (Uganda, Rwanda, Tanzania, Kenya - all four country pipelines approved for publication)