The cables under Mombasa, tracked.

Live systems, landed systems and planned routes — separated by evidence and status. A cable joins the live count when it carries traffic, not when it makes headlines. Verified monthly, every row sourced.

  • 7 live — carrying traffic on the Kenya segment.
  • 1 landed / RFS pending — ashore, ready-for-service not confirmed.
  • 2 planned — announced build or route, not counted as live.

Verified Sep 2026 · monthly sweep

Open cable map

10 systems are tracked · 7 are carrying traffic · 1 is landed but has no announced ready-for-service date · 2 are announced or planned.

A cable joins the live count when service is confirmed — not when it makes headlines, and not when it comes ashore. That discipline is the whole point of this tracker.

Read the methodology
  • Live count unchanged at 7.
  • LuLu added to Planned — the ~500 km coastal diversity route announced at ITW Africa 2026.
  • Africa-1 remains landed with RFS pending; Daraja remains announced.
  • Next review: October 2026.

The full slate

Search, filter and sort every tracked system. Each row expands into the full record with owners, landings, capacity and the evidence behind the status. Design capacity is the operator-reported figure and is usually far above lit capacity, which is not published and is deliberately not estimated here.

Showing 10 of 10 systems

Dotted markers are announced or planned systems (shown at announcement year, not RFS). Tap any entry to open its record.

In serviceCounted live: carrying traffic on the Kenya segment.

Landed, RFS pendingNot counted live: physically ashore, but no ready-for-service date announced.

AnnouncedNot counted live: formally announced build, host or consortium named.

PlannedNot counted live: announced intent, pre-contract or pre-construction.

Methodology: the counting rule

The live count changes on ready-for-service, not on landing. Africa-1 is ashore but not counted until an RFS date is published; Daraja and LuLu are tracked so the pipeline is visible, never counted. Where a claim and the evidence part ways, the row says so. Sources per row; full methodology on the linked explainers.

Design capacity is operator-reported. Lit capacity is not published by operators and is deliberately not estimated here, so the capacity column tells you what was announced, never what is lit.

The dataset is re-verified in a monthly sweep (last verified 2026 09); when something changes, the update panel at the top of the page says what moved and why.