Africa Data Centres Kigali KGL1
Africa Data Centres · Liquid Intelligent Technologies (Cassava Technologies) · Kigali, Kigali Province
Africa Data Centres Kigali KGL1 is a currently under construction data centre facility in Kigali, Kenya, operated by Africa Data Centres. Its designed capacity is 2 MW. It sits inside DC254's four-stage supply pipeline , see how Kenya's market stages up.
Compare Africa Data Centres Kigali KGL1 with Microsoft–G42 AI Data Centre · iXAfrica NBOX2 (Tilisi)
Side by side2 MW
Total capacity
Colocation
Facility type
Overview
Africa Data Centres' first Rwanda facility, announced November 2022 with 2 MW of IT load, in Kigali.
Why it matters
Announced 28 November 2022 by Africa Data Centres (a Cassava Technologies business) as its first facility in Rwanda: 2 MW of IT load, groundbreaking targeted for Q1 2023. Third-party registers (baxtel, inflect) list the site as KGL1 with roughly 2.5 MW of total power. No ready-for-service announcement has been located as of 22 September 2026; the 22 Sep editorial review holds the record as Unsupported pending a primary source.
Where marketing and evidence diverge
Status divergence: announced with Q1 2023 groundbreaking and a 2 MW IT-load design, but no opening has been announced in the 3+ years since, and no independent confirmation of construction progress has been located. Staged as Under Construction on the strength of the operator announcement alone; revisit on any RFS news.
Verification
Unsupported5 claims · 0 sourcesLast editorial evidence review: 2026-09-22
Editor decision, 2026-09-22: DataCentre254 currently lacks sufficient authoritative evidence to verify an operational (or completed) Africa Data Centres facility identified as KGL1 in Kigali. Held as Unsupported; non-existence is NOT asserted. The record stays on hold pending a primary source (a new ADC facility page, a completion notice, or independent confirmation). PAIX has a separately documented Kigali presence.
View evidence
Africa Data Centres operates the KGL1 data centre in Kigali, Rwanda.
unsupportedEditor review 2026-09-22: no material change. The 2026-09-22 negative sweep stands: no dedicated current ADC facility page, no completion or go-live announcement in primary or secondary sweeps.
KGL1 is operated by Africa Data Centres (Cassava Technologies).
unsupportedEditor review 2026-09-22: no material change.
KGL1 operates as a colocation facility.
unsupportedEditor review 2026-09-22: no material change.
KGL1 is located in Kigali, Rwanda.
unsupportedEditor review 2026-09-22: no material change.
KGL1 is under construction with 2MW planned capacity.
unsupportedEditor review 2026-09-22: no material change. The 2022 plan (2 MW, groundbreaking Q1 2023) and aggregator listings are not sufficient to publish any stage claim as verified.