Kenya's data centre pipeline, tracked.
The directory tells you what exists. This page tells you what is moving, live capacity, the staged pipeline, dated deliveries and which operator holds which megawatts. Updated as claims are verified, never as they are issued.
32 facilities · 18 operators · how we verify
20
Live facilities · operational today
10.5 MW
Verified live IT load · in service, not announced
10
Pipeline facilities · 232.0 MW announced
5
AI-ready · operator-stated AI-grade design · what the label means
How to read this page
Full methodologyDC254 separates live infrastructure from planned capacity. Live IT load is not designed capacity, and an announcement is not operating supply. The three measures are never added into one headline number, and every figure traces to a dated source on its record page.
- Live
- Evidence supports the facility operating today. An opening ceremony or a licence is not operation.
- Being built
- Evidence of active construction on a named site. Groundbreakings and proposed start dates do not qualify.
- Committed
- A documented investment or contractual commitment, with the evidence on the record.
- Announced / early stage
- Publicly proposed. The evidence does not yet support a later stage, and we say so.
The capacity explorer
The working tool. Filter the market, switch the measure, and read the total straight off the rows that contribute to it. Kenya records only; the four East Africa reference records sit in the directory.
Published in-service IT load, operational facilities. What servers draw today, the hardest figure to fake.
- iXAfrica NBOX1
iXAfrica Data Centres · Nairobi
4.5 MW
LiveHigh · verified Oct 2026 - iColo Mombasa Two (MBA2)
iColo (Digital Realty) · Mombasa
1.8 MW
LiveHigh · verified Oct 2026 - Safaricom Data Centre (Waiyaki Way)
Safaricom · Nairobi
1.5 MW
LiveMedium · verified Oct 2026 - Liquid Nairobi Data Centre
Liquid Intelligent Technologies Kenya · Nairobi
1 MW
LiveMedium · verified Oct 2026 - iColo Mombasa One (MBA1)
iColo (Digital Realty) · Mombasa
0.9 MW
LiveHigh · verified Oct 2026 - Global TS Data Centre
Global Telecommunications & Services · Nairobi
0.3 MW
LiveLow · verified Oct 2026 - Septris Data Centre
Septris EO Ltd · Nairobi
0.3 MW
LiveLow · verified Sep 2026 - Wananchi Group Data Centre
Wananchi Group · Nairobi
0.2 MW
LiveLow · verified Oct 2026 - Africa Data Centres Nairobi 1 (NBO1)
Africa Data Centres · Nairobi
not disclosed
LiveHigh · verified Oct 2026 - Africa Data Centres Nairobi 2 (planned expansion)
Africa Data Centres · Nairobi
not disclosed
CommittedMedium · verified Oct 2026 - iColo Nairobi One (NBO1)
iColo (Digital Realty) · Nairobi
not disclosed
LiveHigh · verified Oct 2026 - iColo Nairobi Two (NBO2)
iColo (Digital Realty) · Nairobi
not disclosed
LiveMedium · verified Oct 2026 - iXAfrica NBOX1.2
iXAfrica Data Centres · Nairobi
not disclosed
Under ConstructionMedium · verified Oct 2026 - iXAfrica NBOX2 (Tilisi)
iXAfrica Data Centres · Nairobi
not disclosed
CommittedMedium · verified Oct 2026 - Kenya Data Centres SME Facility
Kenya Data Centres (ICT Authority) · Nairobi
not disclosed
Early StageLow · verified Oct 2026 - Konza Cloud Expansion and Smart City Facilities (PPP)
Konza Technopolis Development Authority (KoTDA) · Konza
not disclosed
Early StageMedium · verified Oct 2026 - Konza National Data Centre
Konza Technopolis Development Authority (KoTDA) · Konza
not disclosed
LiveMedium · verified Oct 2026 - Microsoft–G42 AI Data Centre
Safaricom · Nairobi
not disclosed
Early StageMedium · verified Oct 2026 - Nxtra by Airtel Tatu City
Nxtra by Airtel · Ruiru
not disclosed
Under ConstructionMedium · verified Oct 2026 - PAIX Nairobi (NBO-1)
PAIX Data Centres · Nairobi
not disclosed
LiveHigh · verified Oct 2026 - Raxio Nairobi (unverified)
Raxio Data Centres · Nairobi
not disclosed
Early StageLow · verified Oct 2026 - Safaricom Red Hill (Limuru) Campus
Safaricom · Limuru
not disclosed
LiveMedium · verified Oct 2026 - Safaricom Thika Data Centre
Safaricom · Thika
not disclosed
LiveMedium · verified Oct 2026 - SEACOM Mombasa Cable Landing Station
SEACOM · Mombasa
not disclosed
LiveHigh · verified Oct 2026 - SimbaNET Nairobi
SimbaNET Kenya · Nairobi
not disclosed
LiveMedium · verified Oct 2026 - Telkom Kenya: Milimani Exchange
Telkom Kenya · Nairobi
not disclosed
LiveMedium · verified Oct 2026 - Telkom Kenya: Telephone House (Mombasa)
Telkom Kenya · Mombasa
not disclosed
LiveMedium · verified Oct 2026 - Telkom Kenya: Telephone House (Nairobi)
Telkom Kenya · Nairobi
not disclosed
LiveMedium · verified Oct 2026
Totals sum only the rows shown, one measure at a time; live IT load, designed capacity and announced capacity are never added together. With no filters applied, the three totals reproduce the figures in the cards above, both come from the same verified dataset. Figure bases and evidence: how we verify.
Where the market is still unclear
What operators have not published is part of the market record too. We print the gaps rather than guessing past them, and a missing figure is never counted as zero.
20
records with no published live IT load, 12 of them operating facilities. Inspect them in the explorer.
12
records carry no public megawatt figure at all; they show as capacity n/a in the directory rather than an invented number.
7
records rest on a single public source and want corroboration. Challenge or strengthen a record.
7 of 8
pipeline projects have no announced target date; they are listed by name under Coming online below.
The pipeline board
Capacity only counts once it serves a server. We stage every facility the way investors read supply, live, building, committed, announced, so working infrastructure and press releases never share a column.
Live
44.4 MW22 facilities
- iXAfrica NBOX122.5 MWNairobiHigh
- iColo Mombasa Two (MBA2)1.75 MWMombasaHigh
- Safaricom Data Centre (Waiyaki Way)2 MWNairobiMedium
- Liquid Nairobi Data Centre1.5 MWNairobiMedium
- iColo Mombasa One (MBA1)0.9 MWMombasaHigh
- Septris Data Centre0.5 MWNairobiLow
- Global TS Data Centre0.5 MWNairobiLow
- Wananchi Group Data Centre0.5 MWNairobiLow
- Africa Data Centres Nairobi 1 (NBO1)7.5 MWNairobiHigh
- Safaricom Thika Data Centren/aThikaMedium
- Safaricom Red Hill (Limuru) Campusn/aLimuruMedium
- Telkom Kenya: Milimani Exchangen/aNairobiMedium
- Telkom Kenya: Telephone House (Nairobi)n/aNairobiMedium
- iColo Nairobi One (NBO1)n/aNairobiHigh
- iColo Nairobi Two (NBO2)6.4 MWNairobiMedium
- PAIX Nairobi (NBO-1)1.5 MWNairobiHigh
- Konza National Data Centren/aKonzaMedium
- Telkom Kenya: Telephone House (Mombasa)n/aMombasaMedium
- SEACOM Mombasa Cable Landing Stationn/aMombasaHigh
- SimbaNET Nairobin/aNairobiMedium
- Raxio Kampala UG11.5 MWKampalaHigh
- Uganda National Data Centre (NDC1)n/aKampalaMedium
Committed
68.0 MW2 facilities
Where the megawatts actually run
Verified in-service IT load per live facility, designed capacity is deliberately not counted here, because announced numbers are not electrons.
- iXAfrica NBOX14.5 MW
- iColo Mombasa Two (MBA2)1.75 MW
- Safaricom Data Centre (Waiyaki Way)1.5 MW
- Liquid Nairobi Data Centre1 MW
- iColo Mombasa One (MBA1)0.9 MW
- Septris Data Centre0.3 MW
- Global TS Data Centre0.3 MW
- Wananchi Group Data Centre0.2 MW
- Africa Data Centres Nairobi 1 (NBO1)not disclosed
- Safaricom Thika Data Centrenot disclosed
- Safaricom Red Hill (Limuru) Campusnot disclosed
- Telkom Kenya: Milimani Exchangenot disclosed
- Telkom Kenya: Telephone House (Nairobi)not disclosed
- iColo Nairobi One (NBO1)not disclosed
- iColo Nairobi Two (NBO2)not disclosed
- PAIX Nairobi (NBO-1)not disclosed
- Konza National Data Centrenot disclosed
- Telkom Kenya: Telephone House (Mombasa)not disclosed
- SEACOM Mombasa Cable Landing Stationnot disclosed
- SimbaNET Nairobinot disclosed
- Raxio Kampala UG1not disclosed
- Uganda National Data Centre (NDC1)not disclosed
Facilities without a published live IT load are shown at zero length, not excluded, the gap is the story.
Coming online
Pipeline facilities with an announced target date come first. Where no date has been published, we say so, we do not guess delivery windows on a developer's behalf.
Dated deliveries
Nxtra by Airtel · Under Construction · 44 MW
Raxio Data Centres · Under Construction · capacity n/a
No target date announced
- iXAfrica NBOX1.2 · 18 MW
- Africa Data Centres Kigali KGL1 · 2 MW
- iXAfrica NBOX2 (Tilisi) · 53 MW
- Africa Data Centres Nairobi 2 (planned expansion) · 15 MW
- Microsoft–G42 AI Data Centre · 100 MW
- Raxio Nairobi (unverified) · capacity n/a
- Kenya Data Centres SME Facility · capacity n/a
- Konza Cloud Expansion and Smart City Facilities (PPP) · capacity n/a
Operator scoreboard
Two measures per operator, never summed together: published in-service IT load, and design-basis megawatts (designed capacity for built sites, developer-announced figures for pipeline projects). A dash means nothing has been published, not zero.
| Operator | Facilities | Stages | Live IT load (MW) | Designed & announced (MW) |
|---|---|---|---|---|
| SafaricomTelecom | 4 | LiveEarly Stage | 1.5 | 102.0 |
| iXAfrica Data CentresCommercial | 3 | LiveUnder ConstructionCommitted | 4.5 | 93.5 |
| Nxtra by AirtelCommercial · Bharti Airtel (Airtel Africa) | 1 | Under Construction | - | 44.0 |
| Africa Data CentresCommercial · Liquid Intelligent Technologies (Cassava Technologies) | 3 | LiveCommittedUnder Construction | - | 24.5 |
| iColo (Digital Realty)Commercial · Digital Realty | 4 | Live | 2.6 | 6.4 |
| Liquid Intelligent Technologies KenyaCommercial · Cassava Technologies | 1 | Live | 1.0 | 1.5 |
| Raxio Data CentresCommercial · Raxio Group | 3 | Early StageLiveUnder Construction | - | 1.5 |
| PAIX Data CentresCommercial | 1 | Live | - | 1.5 |
| Septris EO LtdCommercial | 1 | Live | 0.3 | 0.5 |
| Global Telecommunications & ServicesCommercial | 1 | Live | 0.3 | 0.5 |
| Wananchi GroupCommercial | 1 | Live | 0.2 | 0.5 |
| Telkom KenyaTelecom · Helios Investment Partners | 3 | Live | - | - |
| Konza Technopolis Development Authority (KoTDA)Government · Government of Kenya | 2 | LiveEarly Stage | - | - |
| SEACOMCarrier | 1 | Live | - | - |
| SimbaNET KenyaTelecom | 1 | Live | - | - |
| Kenya Data Centres (ICT Authority)Government · Kenya ICT Authority | 1 | Early Stage | - | - |
| National Information Technology Authority - Uganda (NITA-U)Government · Government of Uganda | 1 | Live | - | - |
Data-confidence watchlist
The rows we are least sure about, printed in public. Confidence is graded per facility, High means operator-confirmed, Medium means single-source, Low means fragmentary. Gaps listed are the fields we are actively chasing.
Uganda National Data Centre (NDC1)Medium confidence
Unverified: racks, cooling, power, live IT load.
Raxio Nairobi (unverified)Low confidence
Unverified: racks, cooling, power.
Kenya Data Centres SME FacilityLow confidence
Unverified: racks, cooling, power.
Safaricom Thika Data CentreMedium confidence
Unverified: racks, cooling, live IT load.
Telkom Kenya: Telephone House (Nairobi)Medium confidence
Unverified: racks, cooling, live IT load.
Telkom Kenya: Telephone House (Mombasa)Medium confidence
Unverified: racks, cooling, live IT load.
SimbaNET NairobiMedium confidence
Unverified: racks, cooling, live IT load.
Raxio Dar es Salaam TZ1Medium confidence
Unverified: racks, cooling, power.
Africa Data Centres Kigali KGL1Medium confidence
Unverified: racks, cooling, power.
iXAfrica NBOX1.2Medium confidence
Unverified: racks, cooling.
iXAfrica NBOX2 (Tilisi)Medium confidence
Unverified: racks, cooling.
Africa Data Centres Nairobi 2 (planned expansion)Medium confidence
Unverified: racks, cooling.
Safaricom Red Hill (Limuru) CampusMedium confidence
Unverified: racks, live IT load.
Microsoft–G42 AI Data CentreMedium confidence
Unverified: racks, cooling.
iColo Nairobi Two (NBO2)Medium confidence
Unverified: racks, live IT load.
Konza National Data CentreMedium confidence
Unverified: cooling, live IT load.
Nxtra by Airtel Tatu CityMedium confidence
Unverified: racks, cooling.
Konza Cloud Expansion and Smart City Facilities (PPP)Medium confidence
Unverified: racks, cooling.
Telkom Kenya: Milimani ExchangeMedium confidence
Unverified: live IT load.
Septris Data CentreLow confidence
Confidence limited to a single source, corroborating evidence welcome.
Global TS Data CentreLow confidence
Confidence limited to a single source, corroborating evidence welcome.
Wananchi Group Data CentreLow confidence
Confidence limited to a single source, corroborating evidence welcome.
Safaricom Data Centre (Waiyaki Way)Medium confidence
Confidence limited to a single source, corroborating evidence welcome.
Liquid Nairobi Data CentreMedium confidence
Confidence limited to a single source, corroborating evidence welcome.