Skip to content
Kenya DC Tracker

Kenya's data centre pipeline, tracked.

The directory tells you what exists. This page tells you what is moving, live capacity, the staged pipeline, dated deliveries and which operator holds which megawatts. Updated as claims are verified, never as they are issued.

Dataset verified October 2026

32 facilities · 18 operators · how we verify

20

Live facilities · operational today

10.5 MW

Verified live IT load · in service, not announced

10

Pipeline facilities · 232.0 MW announced

5

AI-ready · operator-stated AI-grade design · what the label means

How to read this page

Full methodology

DC254 separates live infrastructure from planned capacity. Live IT load is not designed capacity, and an announcement is not operating supply. The three measures are never added into one headline number, and every figure traces to a dated source on its record page.

Live
Evidence supports the facility operating today. An opening ceremony or a licence is not operation.
Being built
Evidence of active construction on a named site. Groundbreakings and proposed start dates do not qualify.
Committed
A documented investment or contractual commitment, with the evidence on the record.
Announced / early stage
Publicly proposed. The evidence does not yet support a later stage, and we say so.

The capacity explorer

The working tool. Filter the market, switch the measure, and read the total straight off the rows that contribute to it. Kenya records only; the four East Africa reference records sit in the directory.

Published in-service IT load, operational facilities. What servers draw today, the hardest figure to fake.

10.5 MWlive it load total28 of 28 records shown8 with a published figure, 20 not disclosed

Totals sum only the rows shown, one measure at a time; live IT load, designed capacity and announced capacity are never added together. With no filters applied, the three totals reproduce the figures in the cards above, both come from the same verified dataset. Figure bases and evidence: how we verify.

Where the market is still unclear

What operators have not published is part of the market record too. We print the gaps rather than guessing past them, and a missing figure is never counted as zero.

  • 20

    records with no published live IT load, 12 of them operating facilities. Inspect them in the explorer.

  • 12

    records carry no public megawatt figure at all; they show as capacity n/a in the directory rather than an invented number.

  • 7

    records rest on a single public source and want corroboration. Challenge or strengthen a record.

  • 7 of 8

    pipeline projects have no announced target date; they are listed by name under Coming online below.

The pipeline board

Capacity only counts once it serves a server. We stage every facility the way investors read supply, live, building, committed, announced, so working infrastructure and press releases never share a column.

Where the megawatts actually run

Verified in-service IT load per live facility, designed capacity is deliberately not counted here, because announced numbers are not electrons.

Facilities without a published live IT load are shown at zero length, not excluded, the gap is the story.

Coming online

Pipeline facilities with an announced target date come first. Where no date has been published, we say so, we do not guess delivery windows on a developer's behalf.

Dated deliveries

No target date announced

Operator scoreboard

Two measures per operator, never summed together: published in-service IT load, and design-basis megawatts (designed capacity for built sites, developer-announced figures for pipeline projects). A dash means nothing has been published, not zero.

Operators ranked by designed and announced capacity, with published live IT load listed separately
OperatorFacilitiesStagesLive IT load (MW)Designed & announced (MW)
SafaricomTelecom4LiveEarly Stage1.5102.0
iXAfrica Data CentresCommercial3LiveUnder ConstructionCommitted4.593.5
Nxtra by AirtelCommercial · Bharti Airtel (Airtel Africa)1Under Construction-44.0
Africa Data CentresCommercial · Liquid Intelligent Technologies (Cassava Technologies)3LiveCommittedUnder Construction-24.5
iColo (Digital Realty)Commercial · Digital Realty4Live2.66.4
Liquid Intelligent Technologies KenyaCommercial · Cassava Technologies1Live1.01.5
Raxio Data CentresCommercial · Raxio Group3Early StageLiveUnder Construction-1.5
PAIX Data CentresCommercial1Live-1.5
Septris EO LtdCommercial1Live0.30.5
Global Telecommunications & ServicesCommercial1Live0.30.5
Wananchi GroupCommercial1Live0.20.5
Telkom KenyaTelecom · Helios Investment Partners3Live--
Konza Technopolis Development Authority (KoTDA)Government · Government of Kenya2LiveEarly Stage--
SEACOMCarrier1Live--
SimbaNET KenyaTelecom1Live--
Kenya Data Centres (ICT Authority)Government · Kenya ICT Authority1Early Stage--
National Information Technology Authority - Uganda (NITA-U)Government · Government of Uganda1Live--

Data-confidence watchlist

The rows we are least sure about, printed in public. Confidence is graded per facility, High means operator-confirmed, Medium means single-source, Low means fragmentary. Gaps listed are the fields we are actively chasing.