East Africa's Data Centres Compared: The 2026 Guide
Kenya, Uganda, Tanzania, Rwanda and Ethiopia compared: facilities, operators, power, cables and policy. Where East Africa's data capacity actually sits today.

KENYA FOCUS
Everything about data centres in Kenya, where they are, who owns them, how the market works, and why Kenya is becoming the data centre hub of East Africa.
39 articles · Updated Nov 2026
Kenya, Uganda, Tanzania, Rwanda and Ethiopia compared: facilities, operators, power, cables and policy. Where East Africa's data capacity actually sits today.
Wingu Africa operates a carrier-neutral edge data centre in Nairobi built for cloud-on-ramp, CDN, and enterprise workloads. What it offers.
A ResearchAndMarkets report counts 110 MW of planned capacity outside Nairobi. DC254 checks it against our tracker: 20 operational, 8 pipeline, Kisumu zero.
Kenya's PPP fund will pay for advisory and feasibility work on Konza's data centre expansion. What the money buys, the tender trail behind it, and what comes next.
Two critical PHP flaws prompted urgent patching worldwide. DC254 ran a public check of Kenya's government websites: what the signals show, and what they cannot.
Verified signals for 15 Oct 2026: Tanzania's $42bn LNG deal nears final agreements, AI infrastructure debt gets repriced, Kenya's tracker holds at 27 facilities.
Kenya has opened a KDEAP-funded tender for at least 27,000 km of backbone and cross-border fibre, backed by KSh 13 billion. What is verified, what it means.
Announced megawatts are not operating megawatts. What DC254's tracker, power ledger and the Hercules proposal reveal about who can secure electricity.
Africa holds 3% of EMEA's 93 GW of data-centre capacity. Where does Kenya sit? The verified numbers behind Kenya's power, cables and 230 MW pipeline.
Kenya recorded 11.1 billion detected cyber-threat events in FY2025/26. What the figure means for data centres, KIXP, national monitoring and digital infrastructure.
How Kenyan data centres stack physical defences: perimeter, guards, biometrics, mantraps, CCTV retention, rack locks and audit logs. What to verify on a site tour.
What ISO 27001 certification requires from a Kenyan data centre: the ISMS, the audit cycle, the physical controls, and how it maps to the Data Protection Act.
DDoS, ransomware, data harvesting, insiders and physical intrusion: the attack types that hit Kenyan data infrastructure, real examples, and the defences that work.
Digital Realty formally launched NBO2 in Nairobi on 7 September 2026. What the launch delivers: verified capacity, interconnection, ramping reality.
Where does M-Pesa actually run? Inside Safaricom's Waiyaki Way hub and the Red Hill campus in Limuru, and how they differ from carrier-neutral Kenya.
Colocation lets Kenyan banks, telcos and fintechs house critical systems without building. How Nairobi's carrier-neutral market works and how to choose.
Arizton's March 2026 forecast puts Kenya's data centre market at USD 266M in 2025 and USD 805M by 2031. We cross-check the numbers against the ground truth.
iXAfrica operates East Africa's first hyperscale, AI-ready data centre on Mombasa Road, Nairobi. Actis-backed NBOX1 targets 22.5 MW.
Submarine cables, renewable energy, skilled workforce, and growing capacity make Kenya East Africa's natural digital hub for 300 million people.
How to lease rack space in a Nairobi data centre: what Tier III means, which facilities are operational, what to check, and the questions to ask before signing.
Raxio and Africa Data Centres are both expanding in Kenya, but they stand at different stages today. A fact-checked, plain-English comparison for Kenyan buyers.
A Greek energy firm plans a $1.5 billion AI data centre in Mombasa with its own floating power plant. What is confirmed, what is not, and why it matters.
How Kenyan colocation is priced: per rack, per kilowatt, retail versus wholesale, what drives the bill, and honest benchmark ranges to judge quotes against.
Five realistic attack scenarios at a Kenyan data centre: how each unfolds, how fast anyone notices, who responds, and what tenants would actually feel.
Cable cuts, grid trips and floods are normal Kenyan events. A practical disaster recovery and business continuity playbook built for Kenyan conditions, not textbook ones.
From the 2017 election hacking claim to the 2025 companies registry breach: Kenya's documented data disasters, what actually happened, and how each ended.
Microsoft and G42 promised Kenya a $1 billion data centre and a new cloud region. What was announced, why it stalled in 2026, and what comes next.
A plain-English guide to VPS hosting in Kenya with M-Pesa payments: verified local providers, starting prices, and how to choose. Updated September 2026.
The verified numbers behind Kenya's data centre market: 27 tracked facilities, six independent estimates compared, and what each measures.
23 of Kenya's 27 tracked data centres sit in two cities. The three forces behind the cluster: where cables land, where the grid is, where demand lives.
Kenya's data centre market is projected to grow from $180M to $450M by 2030. The investment drivers, expansions, and opportunities behind the curve.
AmCham 2026 delivered $600 million (Sh77.5bn) in one-day US pledges for Kenya, headlined by Oracle's first African cloud region and iColo's $80M project.
Six research firms value Kenya's data centre market from $266M to $606M. We fetched every report page and explain exactly why the numbers diverge.
Arizton values the Middle East and Africa colocation market at $3.33bn in 2025, rising to $12.88bn by 2031. Where Nairobi fits in.
Africa Data Centres, a Cassava Technologies company, operates colocation facilities in Nairobi and Mombasa within a 40+ site Pan-African network.
Liquid Intelligent Technologies runs Africa's largest fibre network and Nairobi data centres, connecting Kenya to 13+ countries and subsea cables.
A due diligence checklist for choosing a Kenyan data centre: power, cooling, connectivity, security, and compliance, before you sign.
The macroeconomic forces driving data centre demand in Kenya, from M-Pesa and fintech to 5G, e-commerce, and government digitisation.
Inside Konza Technopolis, Kenya's 5,000-acre smart city: purpose-built infrastructure, SEZ incentives, and what it means for data centres.
Privacy-first analytics — GA4, cookieless Clarity, PostHog and optional session recording. Nothing analytical loads until you agree. Privacy details.